H.R. 569 - Water Quality Investment Act of 2007
- Sponsor:
- William Pascrell
- Summary:
- To amend the Federal Water Pollution Control Act to authorize appropriations for sewer overflow control grants. (by CRS)
- Status:
- The bill was voted on in the House on March 7, 2007
- Amendments:
- 3 proposed amendments. 1 accepted. 1 rejected. View amendments
PASSED on March 7, 2007.
1/2 required to pass
voted YES: 367
voted NO: 58
8 voted present/not voting
Water Quality Investment Act of 2007
H.R. 569 — 110th Congress (2007–2008)
- Summary
- To amend the Federal Water Pollution Control Act to authorize appropriations for sewer overflow control grants. (by CRS)
- Learn More
- At OpenCongress
- Title
- To amend the Federal Water Pollution Control Act to authorize appropriations for sewer overflow control grants.
- Other Titles
- Water Quality Investment Act of 2007
- Water Quality Investment Act of 2007
- Water Quality Investment Act of 2007
- Sponsor
- William Pascrell
- Co-Sponsors
- Subjects
- Water pollution
- Authorization
- Budgets
- Congressional reporting requirements
- Construction costs
- Environmental Protection Agency
- Environmental protection
- Executive departments
- Federal aid to water pollution control
- Federal-state relations
- Revolving funds
- Sewage treatment
- Sewerage
- Solid wastes
- State and local government
- Related Bills
- Major Actions
Introduced 1/18/2007 Referred to Committee Amendments (3 proposed) Passed House 3/07/2007 - Bill History
-
Chamber/Committee Motion Date Result select this vote House On agreeing to the King (IA) amendment (A001) Agreed to by voice vote. 3/07/2007 PASSED by voice vote select this vote House On agreeing to the Transportation amendment (A004) Agreed to by voice vote. 3/07/2007 PASSED by voice vote select this vote House Amendment 2 to H.R. 569 3/07/2007 This amendment DID NOT PASS the House 166 voted YES 260 voted NO 13 voted present/not votingselect this vote House On Motion to Recommit with Instructions: H.R. 569 Water Quality Investment Act 3/07/2007 This motion PASSED the House 425 voted YES 0 voted NO 8 voted present/not votingcurrently selected House On Passage - House - H.R. 569 Water Quality Investment Act 3/07/2007 This bill PASSED the House 367 voted YES 58 voted NO 8 voted present/not votingAction Date Description Introduced 1/18/2007 1/18/2007 Referred to the House Committee on Transportation and Infrastructure. 1/19/2007 Referred to the Subcommittee on Water Resources and Environment. 1/22/2007 Sponsor introductory remarks on measure. (CR E167) 1/31/2007 Subcommittee Hearings Held. 1/31/2007 Subcommittee Consideration and Mark-up Session Held. 1/31/2007 Forwarded by Subcommittee to Full Committee (Amended) by Voice Vote . 2/07/2007 Committee Consideration and Mark-up Session Held. Put on a legislative calendar 2/07/2007 Ordered to be Reported by Voice Vote. 2/16/2007 Reported (Amended) by the Committee on Transportation. H. Rept. 110-16. Put on a legislative calendar 2/16/2007 Placed on the Union Calendar, Calendar No. 7. 3/06/2007 Rules Committee Resolution H. Res. 214 Reported to House. Rule provides for consideration of H.R. 569 with 1 hour of general debate. Previous question shall be considered as ordered without intervening motions except motion to recommit with or without instructions. Measure will be considered read. Bill is open to amendments. All points of order against consideration of the bill are waived except those arising under clause 9 or 10 of rule XXI. It shall be in order to consider as an original bill for the purpose of amendment under the five-minute rule the amendment in the nature of a substitute recommended by the Committee on Transportation and Infrastructure now printed in the bill. 3/07/2007 Amendment (A001) offered by Mr. King (IA). 3/07/2007 DEBATE - The Committee of the Whole proceeded with debate on the King (IA) amendment under the five-minute rule. select this vote Vote 3/07/2007 On agreeing to the King (IA) amendment (A001) Agreed to by voice vote. 3/07/2007 Amendment (A002) offered by Mr. Price (GA). 3/07/2007 DEBATE - The Committee of the Whole proceeded with debate on the Price(GA) amendment under the five-minute rule. 3/07/2007 POSTPONED PROCEEDINGS - At the conclusion of debate on the Price(GA) amendment, the Chair put the question on adoption of the amendment and by voice vote, announced that the noes prevailed. Mr. Price(GA) demanded a recorded vote and the Chair postponed further proceedings on the question of adoption of the amendment until later in the legislative day. 3/07/2007 Amendment (A003) offered by Mr. Rohrabacher. 3/07/2007 DEBATE - The Committee of the Whole proceeded with debate on the Rohrabacher amendment under the five-minute rule, pending reservation of a point of order. 3/07/2007 Ms. Johnson, E. B. moved that the Committee rise. 3/07/2007 Ms. Johnson, E. B. raised a point of order against the Rohrabacher amendment (A003). Ms. Johnson stated that the provisions of the Rohrabacher amendment were not germane to the bill. The Chair sustained the point of order. 3/07/2007 On motion that the Committee rise Agreed to by voice vote. 3/07/2007 Committee of the Whole House on the state of the Union rises leaving H.R. 569 as unfinished business. 3/07/2007 Considered as unfinished business. 3/07/2007 The House resolved into Committee of the Whole House on the state of the Union for further consideration. 3/07/2007 UNFINISHED BUSINESS - The Chair announced that the unfinished business was the question of adoption of an amendment which had been debated earlier and on which further proceedings had been postponed. 3/07/2007 The House rose from the Committee of the Whole House on the state of the Union to report H.R. 569. 3/07/2007 The previous question was ordered pursuant to the rule. 3/07/2007 The House adopted the amendment in the nature of a substitute as agreed to by the Committee of the Whole House on the state of the Union. 3/07/2007 Mr. McHenry moved to recommit with instructions to Transportation. 3/07/2007 Floor summary: DEBATE - The House proceeded with 10 minutes of debate on the McHenry motion to recommit with instructions. The instructions contained in the motion seek to require the bill to be reported back to the House with an amendment inserting at the end of the bill a new section on limitation on the use of funds. 3/07/2007 The previous question on the motion to recommit with instructions was ordered without objection. 3/07/2007 Amendment reported by the House Committee on Transportation and Infrastruct. select this vote Vote 3/07/2007 On agreeing to the Transportation amendment (A004) Agreed to by voice vote. select this vote Vote 3/07/2007 Amendment 2 to H.R. 569 select this vote Vote 3/07/2007 On Motion to Recommit with Instructions: H.R. 569 Water Quality Investment Act currently selected House Vote on Passage 3/07/2007 On Passage - House - H.R. 569 Water Quality Investment Act 3/08/2007 Rule H. Res. 214 passed House. 3/08/2007 Considered under the provisions of rule H. Res. 214. 3/08/2007 House resolved itself into the Committee of the Whole House on the state of the Union pursuant to H. Res. 214 and Rule XVIII. 3/08/2007 The Speaker designated the Honorable Adam B. Schiff to act as Chairman of the Committee. 3/08/2007 Rule provides for consideration of H.R. 569 with 1 hour of general debate. Previous question shall be considered as ordered without intervening motions except motion to recommit with or without instructions. Measure will be considered read. Bill is open to amendments. All points of order against consideration of the bill are waived except those arising under clause 9 or 10 of rule XXI. It shall be in order to consider as an original bill for the purpose of amendment under the five-minute rule the amendment in the nature of a substitute recommended by the Committee on Transportation and Infrastructure now printed in the bill. 3/08/2007 GENERAL DEBATE - The Committee of the Whole proceeded with one hour of general debate on H.R. 569. 3/08/2007 Received in the Senate and Read twice and referred to the Committee on Environment and Public Works. Number Sponsor Date Offered Status select this vote H. Amdt. 24 King, Steve [R-IA5] March 7, 2007 Passed by voice vote on March 7, 2007. Amendment reduces funding in the sewer overflow control grants section by 5 percent.
select this vote H. Amdt. 25 Price, Tom [R-GA6] March 7, 2007 Failed by roll call vote on March 7, 2007. An amendment numbered 1 printed in the Congressional Record to add a new section to the bill requiring offsets.
H. Amdt. 26 Rohrabacher, Dana [R-CA46] March 7, 2007 Offered on March 6, 2007. Amendment information not available.
Total contributions given to House members within 30 days of the vote "On Passage - House - H.R. 569 Water Quality Investment Act" from interest groups that…
supported this bill
| Engineering, architecture & construction mgmt svcs |
| Environmental policy |
| Special trade contractors |
| Water Utilities |
opposed this bill
| Contributor | Interest group | Amount | Date | House member | Party | State | Vote |
|---|---|---|---|---|---|---|---|
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/5/07 | Alan Mollohan | D | WV-1 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/5/07 | David Price | D | NC-4 | Yes |
| Lane, Mike | Engineering, architecture & construction mgmt svcs | $1,000 | 2/5/07 | Devin Nunes | R | CA-21 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/5/07 | Henry Cuellar | D | TX-28 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 2/5/07 | John Spratt | D | SC-5 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/5/07 | William Pascrell | D | NJ-8 | Yes |
| Flint, Robert | Environmental policy | $1,000 | 2/6/07 | Jerry McNerney | D | CA-11 | Yes |
| Folks, S Grey | Engineering, architecture & construction mgmt svcs | $1,000 | 2/6/07 | Thelma Drake | R | VA-2 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/6/07 | Kenny Hulshof | R | MO-9 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 2/6/07 | Loretta Sanchez | D | CA-47 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/6/07 | Bob Filner | D | CA-51 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/6/07 | Jon Porter | R | NV-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/6/07 | Lucille Roybal-Allard | D | CA-34 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/7/07 | Gerald Weller | R | IL-11 | Yes |
| Neu, John L | Environmental policy | $2,300 | 2/7/07 | Thomas Allen | D | ME-1 | Yes |
| Sierra Club | Environmental policy | $2,000 | 2/7/07 | John Dingell | D | MI-15 | Yes |
| Moore, Dennis | Special trade contractors | $500 | 2/8/07 | John Shimkus | R | IL-19 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/8/07 | Jo Bonner | R | AL-1 | Yes |
| Salt River Valley Water User's Assn | Water Utilities | $1,000 | 2/8/07 | Raul Grijalva | D | AZ-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/9/07 | Bill Sali | R | ID-1 | No |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/9/07 | Dan Boren | D | OK-2 | Yes |
| Gaalswyk, Peter T | Engineering, architecture & construction mgmt svcs | $500 | 2/9/07 | Devin Nunes | R | CA-21 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 2/9/07 | Bob Etheridge | D | NC-2 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 2/9/07 | Maurice Hinchey | D | NY-22 | Yes |
| National Rural Water Assn | Water Utilities | $500 | 2/9/07 | Dan Boren | D | OK-2 | Yes |
| Rose, Jonathan F | Environmental policy | $2,300 | 2/9/07 | John Hall | D | NY-19 | Yes |
| Rose, Jonathan F | Environmental policy | $2,300 | 2/9/07 | John Hall | D | NY-19 | Yes |
| Sierra Club | Environmental policy | $2,000 | 2/9/07 | David Obey | D | WI-7 | Yes |
| Kellemer, Josef | Special trade contractors | $1,000 | 2/11/07 | John Sarbanes | D | MD-3 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/12/07 | Connie Mack | R | FL-14 | No |
| Mccabe, Elizabeth | Special trade contractors | $2,100 | 2/12/07 | Jeffrey Fortenberry | R | NE-1 | Yes |
| Mccabe, Patrick | Special trade contractors | $2,100 | 2/12/07 | Jeffrey Fortenberry | R | NE-1 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $2,000 | 2/13/07 | Ron Lewis | R | KY-2 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,500 | 2/13/07 | Donald Manzullo | R | IL-16 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/13/07 | Jon Porter | R | NV-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/14/07 | Thelma Drake | R | VA-2 | Yes |
| Boyd, W W | Engineering, architecture & construction mgmt svcs | $250 | 2/14/07 | Steven Pearce | R | NM-2 | Yes |
| Dmjm+harris | Engineering, architecture & construction mgmt svcs | $1,212 | 2/14/07 | James Oberstar | D | MN-8 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 2/14/07 | John Murtha | D | PA-12 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/14/07 | Donald Young | R | AK | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/14/07 | Kirsten Gillibrand | D | NY-20 | Yes |
| Hui, Lawrence | Environmental policy | $500 | 2/15/07 | Thomas Allen | D | ME-1 | Yes |
| Laing, Katherine K | Environmental policy | $250 | 2/15/07 | Janice Schakowsky | D | IL-9 | Yes |
| League of Conservation Voters | Environmental policy | $500 | 2/15/07 | Kirsten Gillibrand | D | NY-20 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 2/15/07 | Baron Hill | D | IN-9 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 2/15/07 | David Loebsack | D | IA-2 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 2/15/07 | Ed Perlmutter | D | CO-7 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 2/15/07 | Michael Arcuri | D | NY-24 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 2/15/07 | Paul Hodes | D | NH-2 | Yes |
| Moreau, Philippe | Engineering, architecture & construction mgmt svcs | $2,100 | 2/15/07 | J. Hastert | R | IL-14 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $5,000 | 2/15/07 | Christopher Cannon | R | UT-3 | No |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $1,000 | 2/15/07 | Shelley Berkley | D | NV-1 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/15/07 | Brad Sherman | D | CA-27 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $-1,000 | 2/15/07 | Peter Visclosky | D | IN-1 | Yes |
| Sierra Club | Environmental policy | $-50 | 2/15/07 | Earl Blumenauer | D | OR-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $3,484 | 2/16/07 | Peter DeFazio | D | OR-4 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Artur Davis | D | AL-7 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Donald Young | R | AK | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Gerald Weller | R | IL-11 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Vern Buchanan | R | FL-13 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | William Pascrell | D | NJ-8 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $5,000 | 2/16/07 | Roy Blunt | R | MO-7 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,500 | 2/16/07 | Edward Pastor | D | AZ-4 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,500 | 2/16/07 | John Murtha | D | PA-12 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,500 | 2/16/07 | Joseph Crowley | D | NY-7 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Daniel Lipinski | D | IL-3 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Donald Young | R | AK | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | John Doolittle | R | CA-4 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | John Salazar | D | CO-3 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Leonard Boswell | D | IA-3 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | Rahm Emanuel | D | IL-5 | Yes |
| Kimball, L Robert Mr | Engineering, architecture & construction mgmt svcs | $1,000 | 2/16/07 | John Murtha | D | PA-12 | Yes |
| Sierra Club | Environmental policy | $1,000 | 2/16/07 | James Clyburn | D | SC-6 | Yes |
| Sierra Club | Environmental policy | $1,000 | 2/16/07 | John Spratt | D | SC-5 | Yes |
| Day & Zimmerman | Engineering, architecture & construction mgmt svcs | $2,500 | 2/19/07 | John Murtha | D | PA-12 | Yes |
| Day & Zimmerman | Engineering, architecture & construction mgmt svcs | $1,000 | 2/19/07 | Charles Dent | R | PA-15 | Yes |
| Day & Zimmerman | Engineering, architecture & construction mgmt svcs | $1,000 | 2/19/07 | Todd Tiahrt | R | KS-4 | Yes |
| Leo a Daly Co | Engineering, architecture & construction mgmt svcs | $1,000 | 2/19/07 | Sheila Jackson-Lee | D | TX-18 | Yes |
| Loukota, James | Special trade contractors | $2,300 | 2/19/07 | Mark Kirk | R | IL-10 | Yes |
| Loukota, James | Special trade contractors | $1,900 | 2/19/07 | Mark Kirk | R | IL-10 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 2/20/07 | John Shimkus | R | IL-19 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/20/07 | Doris Matsui | D | CA-5 | Yes |
| Witty, Joanne | Environmental policy | $1,000 | 2/20/07 | Melissa Bean | D | IL-8 | Yes |
| Beldon, Michael D | Special trade contractors | $500 | 2/21/07 | Lamar Smith | R | TX-21 | Yes |
| Beldon, Michael D | Special trade contractors | $500 | 2/21/07 | Rahm Emanuel | D | IL-5 | Yes |
| Goyke, Gary R | Special trade contractors | $500 | 2/21/07 | Tammy Baldwin | D | WI-2 | Yes |
| Hanson Professional Services | Engineering, architecture & construction mgmt svcs | $1,000 | 2/21/07 | John Shimkus | R | IL-19 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $-1,000 | 2/21/07 | David Weldon | R | FL-15 | No |
| Barley, Mary | Environmental policy | $1,000 | 2/22/07 | Tim Mahoney | D | FL-16 | Yes |
| National Assn of Home Builders | Engineering, architecture & construction mgmt svcs | $2,500 | 2/22/07 | Thomas Petri | R | WI-6 | Yes |
| Tagney-Jones, Maryanne | Environmental policy | $1,000 | 2/22/07 | James McDermott | D | WA-7 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 2/23/07 | Bob Filner | D | CA-51 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 2/23/07 | John Mica | R | FL-7 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 2/23/07 | Kenny Hulshof | R | MO-9 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $500 | 2/23/07 | Lee Terry | R | NE-2 | Yes |
| Leo a Daly Co | Engineering, architecture & construction mgmt svcs | $1,000 | 2/23/07 | Rahm Emanuel | D | IL-5 | Yes |
| Mr Dennis Obrien | Engineering, architecture & construction mgmt svcs | $600 | 2/23/07 | William Pascrell | D | NJ-8 | Yes |
| Carroll, Larry V | Engineering, architecture & construction mgmt svcs | $1,000 | 2/24/07 | Shelley Berkley | D | NV-1 | Yes |
| Holloway, Michael B Pe Phd | Engineering, architecture & construction mgmt svcs | $1,000 | 2/24/07 | Shelley Berkley | D | NV-1 | Yes |
| Bystryn, Marcia | Environmental policy | $250 | 2/26/07 | John Hall | D | NY-19 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,500 | 2/26/07 | Grace Napolitano | D | CA-38 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/26/07 | Corrine Brown | D | FL-3 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 2/26/07 | Jerry Costello | D | IL-12 | Yes |
| Dannenbaum, James D | Engineering, architecture & construction mgmt svcs | $1,000 | 2/26/07 | Rahm Emanuel | D | IL-5 | Yes |
| Dannenbaum, Shirley M | Engineering, architecture & construction mgmt svcs | $1,000 | 2/26/07 | Rahm Emanuel | D | IL-5 | Yes |
| Dunaway, James R | Engineering, architecture & construction mgmt svcs | $2,000 | 2/26/07 | Kay Granger | R | TX-12 | Yes |
| National Assn of Water Companies | Water Utilities | $2,500 | 2/26/07 | Charles Rangel | D | NY-15 | Yes |
| National Assn of Water Companies | Water Utilities | $1,000 | 2/26/07 | Albert Wynn | D | MD-4 | Yes |
| National Assn of Water Companies | Water Utilities | $1,000 | 2/26/07 | John Dingell | D | MI-15 | Yes |
| Simon, Diane Meyer | Environmental policy | $1,000 | 2/26/07 | Lois Capps | D | CA-23 | Yes |
| Aiello, Joseph C | Engineering, architecture & construction mgmt svcs | $250 | 2/27/07 | James McGovern | D | MA-3 | Yes |
| Gallagher, Jerry Mr | Engineering, architecture & construction mgmt svcs | $2,000 | 2/27/07 | Samuel Johnson | R | TX-3 | No |
| Neu, John L | Environmental policy | $2,300 | 2/27/07 | Kirsten Gillibrand | D | NY-20 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $2,100 | 2/27/07 | Thelma Drake | R | VA-2 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 2/27/07 | Hilda Solis | D | CA-32 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,000 | 2/27/07 | Howard McKeon | R | CA-25 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Baron Hill | D | IN-9 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Brian Bilbray | R | CA-50 | No |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Corrine Brown | D | FL-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Edward Pastor | D | AZ-4 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Grace Napolitano | D | CA-38 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Henry Johnson | D | GA-4 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Howard Coble | R | NC-6 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Jerry Costello | D | IL-12 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Jesse Jackson | D | IL-2 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Jim Costa | D | CA-20 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Jo Ann Davis | R | VA-1 | Not Voting |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | John Salazar | D | CO-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Michael Capuano | D | MA-8 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Michael Honda | D | CA-15 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 2/27/07 | Steven Pearce | R | NM-2 | Yes |
| Summers Brittenham, Carolyn | Environmental policy | $250 | 2/27/07 | John Hall | D | NY-19 | Yes |
| United Water | Water Utilities | $1,000 | 2/27/07 | William Pascrell | D | NJ-8 | Yes |
| Font, Dane | Engineering, architecture & construction mgmt svcs | $500 | 2/28/07 | Donald Young | R | AK | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $2,500 | 2/28/07 | Steny Hoyer | D | MD-5 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $2,000 | 2/28/07 | Earl Blumenauer | D | OR-3 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 2/28/07 | Ellen Tauscher | D | CA-10 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 2/28/07 | Thomas Edwards | D | TX-17 | Yes |
| Mejia, Braulio | Engineering, architecture & construction mgmt svcs | $500 | 2/28/07 | Donald Young | R | AK | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/28/07 | Lynn Westmoreland | R | GA-3 | No |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 2/28/07 | Steven Pearce | R | NM-2 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 2/28/07 | Thomas Edwards | D | TX-17 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,500 | 2/28/07 | John Tanner | D | TN-8 | Yes |
| Penin, Carlos a | Engineering, architecture & construction mgmt svcs | $2,000 | 2/28/07 | Donald Young | R | AK | Yes |
| Riefkohl, Ana | Engineering, architecture & construction mgmt svcs | $1,250 | 2/28/07 | Donald Young | R | AK | Yes |
| Riefkohl, Fred | Engineering, architecture & construction mgmt svcs | $1,250 | 2/28/07 | Donald Young | R | AK | Yes |
| Straight, Terry | Special trade contractors | $250 | 2/28/07 | Frank Wolf | R | VA-10 | Yes |
| Suarez, Jj | Engineering, architecture & construction mgmt svcs | $1,250 | 2/28/07 | Donald Young | R | AK | Yes |
| Wells, Ronald | Engineering, architecture & construction mgmt svcs | $2,300 | 2/28/07 | Earl Blumenauer | D | OR-3 | Yes |
| Wells, Ronald | Engineering, architecture & construction mgmt svcs | $2,300 | 2/28/07 | Earl Blumenauer | D | OR-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/1/07 | Lynn Westmoreland | R | GA-3 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/1/07 | Michael Rogers | R | AL-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $2,500 | 3/2/07 | James Clyburn | D | SC-6 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | John Doolittle | R | CA-4 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | John Mica | R | FL-7 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | Steven Pearce | R | NM-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | Timothy Bishop | D | NY-1 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | Timothy Johnson | R | IL-15 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/2/07 | Virginia Foxx | R | NC-5 | No |
| Lynch, Sarah G | Environmental policy | $1,000 | 3/2/07 | Christopher Van Hollen | D | MD-8 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/2/07 | Allen Boyd | D | FL-2 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/2/07 | Sam Farr | D | CA-17 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/2/07 | Tim Holden | D | PA-17 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/2/07 | Virgil Goode | R | VA-5 | No |
| Trujillo, Charlie V | Engineering, architecture & construction mgmt svcs | $500 | 3/3/07 | James Oberstar | D | MN-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/5/07 | Rick Larsen | D | WA-2 | Yes |
| Brainerd, Paul | Environmental policy | $2,000 | 3/5/07 | James McDermott | D | WA-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $5,000 | 3/5/07 | Ed Perlmutter | D | CO-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $5,000 | 3/5/07 | John Salazar | D | CO-3 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $2,500 | 3/5/07 | Ellen Tauscher | D | CA-10 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/5/07 | Earl Blumenauer | D | OR-3 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/5/07 | Edward Pastor | D | AZ-4 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/5/07 | Thomas Edwards | D | TX-17 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $-5,000 | 3/5/07 | Ed Perlmutter | D | CO-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $-5,000 | 3/5/07 | Ed Perlmutter | D | CO-7 | Yes |
| Matherly, Dale | Special trade contractors | $1,000 | 3/5/07 | Mary Fallin | R | OK-5 | Yes |
| Boyd, W W | Engineering, architecture & construction mgmt svcs | $250 | 3/6/07 | Timothy Walberg | R | MI-7 | Yes |
| Hammond, Wilton N | Engineering, architecture & construction mgmt svcs | $500 | 3/6/07 | Kay Granger | R | TX-12 | Yes |
| Markar, Joseph | Engineering, architecture & construction mgmt svcs | $1,000 | 3/6/07 | Elijah Cummings | D | MD-7 | Yes |
| Parson, Barbara W | Environmental policy | $500 | 3/6/07 | Joe Courtney | D | CT-2 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $1,000 | 3/6/07 | William Pascrell | D | NJ-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/7/07 | Dave Reichert | R | WA-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/7/07 | Shelley Berkley | D | NV-1 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/7/07 | Steven LaTourette | R | OH-14 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/7/07 | William Shuster | R | PA-9 | Yes |
| American Subcontractors Assn | Special trade contractors | $1,000 | 3/7/07 | Paul Kanjorski | D | PA-11 | Yes |
| De Luca, Joseph | Water Utilities | $600 | 3/7/07 | William Pascrell | D | NJ-8 | Yes |
| Edwards, Jon | Special trade contractors | $250 | 3/7/07 | John Boehner | R | OH-8 | Yes |
| Floryan, Kenneth | Environmental policy | $2,300 | 3/7/07 | Joe Courtney | D | CT-2 | Yes |
| Floryan, Kenneth | Environmental policy | $2,300 | 3/7/07 | Joe Courtney | D | CT-2 | Yes |
| Kievit, Kenneth Mr | Special trade contractors | $1,500 | 3/7/07 | Scott Garrett | R | NJ-5 | No |
| League of Conservation Voters | Environmental policy | $250 | 3/7/07 | Gabrielle Giffords | D | AZ-8 | Yes |
| Mckeen, Robert | Engineering, architecture & construction mgmt svcs | $500 | 3/7/07 | Heather Wilson | R | NM-1 | Yes |
| Mechanical Contractors Assn of America | Special trade contractors | $1,000 | 3/7/07 | Dave Reichert | R | WA-8 | Yes |
| Mechanical Contractors Assn of America | Special trade contractors | $1,000 | 3/7/07 | Dave Reichert | R | WA-8 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/7/07 | Jack Kingston | R | GA-1 | No |
| Obrien, Thomas | Engineering, architecture & construction mgmt svcs | $300 | 3/7/07 | William Pascrell | D | NJ-8 | Yes |
| Salt River Valley Water User's Assn | Water Utilities | $1,000 | 3/7/07 | Gabrielle Giffords | D | AZ-8 | Yes |
| Yearout, Kevin | Special trade contractors | $2,300 | 3/7/07 | Heather Wilson | R | NM-1 | Yes |
| Blackford, Loren | Environmental policy | $500 | 3/8/07 | John Hall | D | NY-19 | Yes |
| League of Conservation Voters | Environmental policy | $250 | 3/8/07 | Nick Rahall | D | WV-3 | Yes |
| Moir, Rob | Environmental policy | $1,056 | 3/8/07 | Paul Hodes | D | NH-2 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $500 | 3/8/07 | Rick Larsen | D | WA-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/9/07 | Donald Young | R | AK | Yes |
| Boyd, Ww | Engineering, architecture & construction mgmt svcs | $600 | 3/9/07 | Marilyn Musgrave | R | CO-4 | No |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $5,000 | 3/9/07 | Michael Simpson | R | ID-2 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/9/07 | Rick Larsen | D | WA-2 | Yes |
| Dmjm+harris | Engineering, architecture & construction mgmt svcs | $1,000 | 3/9/07 | David Obey | D | WI-7 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 3/9/07 | Adrian Smith | R | NE-3 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 3/9/07 | Lee Terry | R | NE-2 | Yes |
| Masucci, Nicholas | Engineering, architecture & construction mgmt svcs | $2,100 | 3/9/07 | Eric Cantor | R | VA-7 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/9/07 | Thomas Edwards | D | TX-17 | Yes |
| Philadelphia Suburban Corp | Water Utilities | $1,000 | 3/9/07 | Joe Sestak | D | PA-7 | Yes |
| Puzio, Raymond J Mr | Special trade contractors | $2,300 | 3/9/07 | Edward Royce | R | CA-40 | No |
| Martin, Christopher C | Engineering, architecture & construction mgmt svcs | $1,000 | 3/10/07 | Lucille Roybal-Allard | D | CA-34 | Yes |
| Orozco, Gerard | Engineering, architecture & construction mgmt svcs | $525 | 3/10/07 | Lucille Roybal-Allard | D | CA-34 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $2,500 | 3/12/07 | Ellen Tauscher | D | CA-10 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Brian Bilbray | R | CA-50 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Paul Ryan | R | WI-1 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Steve Kagen | D | WI-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Thelma Drake | R | VA-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Thomas Latham | R | IA-4 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Walter Herger | R | CA-2 | No |
| Benenson, Lawrence B | Environmental policy | $1,000 | 3/12/07 | Allyson Schwartz | D | PA-13 | Yes |
| Blank, Diana Ms | Environmental policy | $1,000 | 3/12/07 | Nick Rahall | D | WV-3 | Yes |
| Curling, Bonnie | Special trade contractors | $2,300 | 3/12/07 | J. Forbes | R | VA-4 | Yes |
| Curling, Bonnie | Special trade contractors | $2,300 | 3/12/07 | J. Forbes | R | VA-4 | Yes |
| Curling, William | Special trade contractors | $2,300 | 3/12/07 | J. Forbes | R | VA-4 | Yes |
| Curling, William | Special trade contractors | $2,300 | 3/12/07 | J. Forbes | R | VA-4 | Yes |
| Epstein, Sidney | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Melissa Bean | D | IL-8 | Yes |
| Halliburton Co | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Thelma Drake | R | VA-2 | Yes |
| Kimball, L Robert | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Christopher Carney | D | PA-10 | Yes |
| Michael Baker Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 3/12/07 | Thomas Davis | R | VA-11 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,000 | 3/12/07 | Earl Blumenauer | D | OR-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,000 | 3/12/07 | William Clay | D | MO-1 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Brad Ellsworth | D | IN-8 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Ellen Tauscher | D | CA-10 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Leonard Boswell | D | IA-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Neil Abercrombie | D | HI-1 | Not Voting |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Thelma Drake | R | VA-2 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/12/07 | Thomas Petri | R | WI-6 | Yes |
| Powers, John | Environmental policy | $1,000 | 3/12/07 | Grace Napolitano | D | CA-38 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/13/07 | Thomas Petri | R | WI-6 | Yes |
| Hntb Holdings | Engineering, architecture & construction mgmt svcs | $1,000 | 3/13/07 | Jerrold Nadler | D | NY-8 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/13/07 | Howard McKeon | R | CA-25 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/13/07 | Rubén Hinojosa | D | TX-15 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $2,000 | 3/14/07 | James Moran | D | VA-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Dave Reichert | R | WA-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Gene Taylor | D | MS-4 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Howard McKeon | R | CA-25 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | John Kline | R | MN-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Michael Honda | D | CA-15 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Patrick McHenry | R | NC-10 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Samuel Graves | R | MO-6 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Shelley Berkley | D | NV-1 | Yes |
| Boyd, Ww | Engineering, architecture & construction mgmt svcs | $250 | 3/14/07 | Zach Wamp | R | TN-3 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | David Hobson | R | OH-7 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $500 | 3/14/07 | Rick Larsen | D | WA-2 | Yes |
| Hntb Holdings | Engineering, architecture & construction mgmt svcs | $500 | 3/14/07 | Rick Larsen | D | WA-2 | Yes |
| Michael Baker Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Thelma Drake | R | VA-2 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 3/14/07 | Roy Blunt | R | MO-7 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/14/07 | Jon Porter | R | NV-3 | Yes |
| Salt River Valley Water User's Assn | Water Utilities | $1,500 | 3/14/07 | Jeff Flake | R | AZ-6 | No |
| Salt River Valley Water User's Assn | Water Utilities | $1,000 | 3/14/07 | Harry Mitchell | D | AZ-5 | Yes |
| Tolles, Martha G | Environmental policy | $1,000 | 3/14/07 | Adam Schiff | D | CA-29 | Yes |
| Atkins, John L Iii | Engineering, architecture & construction mgmt svcs | $1,000 | 3/15/07 | Bob Etheridge | D | NC-2 | Yes |
| Cashman, Jay | Special trade contractors | $2,000 | 3/15/07 | John Olver | D | MA-1 | Yes |
| Dewberry, Sidney | Engineering, architecture & construction mgmt svcs | $2,300 | 3/15/07 | Frank Wolf | R | VA-10 | Yes |
| Dubois, Philip | Environmental policy | $2,300 | 3/15/07 | Paul Hodes | D | NH-2 | Yes |
| Garcia, Rodrigo T | Engineering, architecture & construction mgmt svcs | $250 | 3/15/07 | Hilda Solis | D | CA-32 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/15/07 | Michael Simpson | R | ID-2 | Yes |
| Sierra Club | Environmental policy | $1,000 | 3/15/07 | George Miller | D | CA-7 | Yes |
| Sierra Club | Environmental policy | $1,000 | 3/15/07 | Steny Hoyer | D | MD-5 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | Howard Coble | R | NC-6 | Yes |
| Fischer, Eddie R Mr | Special trade contractors | $400 | 3/16/07 | Edward Royce | R | CA-40 | No |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $5,000 | 3/16/07 | Steny Hoyer | D | MD-5 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,500 | 3/16/07 | Ellen Tauscher | D | CA-10 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,500 | 3/16/07 | Thomas Davis | R | VA-11 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $2,000 | 3/16/07 | Kay Granger | R | TX-12 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | Adam Schiff | D | CA-29 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | Lincoln Davis | D | TN-4 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | Thomas Latham | R | IA-4 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 3/16/07 | Jerry Lewis | R | CA-41 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,500 | 3/16/07 | Thomas Davis | R | VA-11 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | James Ramstad | R | MN-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/16/07 | Kendrick Meek | D | FL-17 | Yes |
| Coughlin, Elizabeth | Environmental policy | $300 | 3/17/07 | Martin Meehan | D | MA-5 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $5,000 | 3/17/07 | James Clyburn | D | SC-6 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/17/07 | Jerry Costello | D | IL-12 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/19/07 | Steven Chabot | R | OH-1 | Yes |
| Cashman, Jay M | Special trade contractors | $2,000 | 3/19/07 | Barney Frank | D | MA-4 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $2,500 | 3/19/07 | Thomas Davis | R | VA-11 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/19/07 | Artur Davis | D | AL-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/19/07 | Jesse Jackson | D | IL-2 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/19/07 | Walter Herger | R | CA-2 | No |
| Figueiroa, Russell | Engineering, architecture & construction mgmt svcs | $2,300 | 3/19/07 | Mazie Hirono | D | HI-2 | Yes |
| Floryan, Kenneth J | Environmental policy | $2,300 | 3/19/07 | Christopher Murphy | D | CT-5 | Yes |
| Floryan, Kenneth J | Environmental policy | $2,300 | 3/19/07 | Christopher Murphy | D | CT-5 | Yes |
| Koga, Chester | Engineering, architecture & construction mgmt svcs | $2,300 | 3/19/07 | Mazie Hirono | D | HI-2 | Yes |
| Tagney-Jones, Maryanne | Environmental policy | $1,000 | 3/19/07 | James McDermott | D | WA-7 | Yes |
| Toba, Bert R | Engineering, architecture & construction mgmt svcs | $2,300 | 3/19/07 | Mazie Hirono | D | HI-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $2,500 | 3/20/07 | Thomas Davis | R | VA-11 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Gary Miller | R | CA-42 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | John Boozman | R | AR-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Vern Buchanan | R | FL-13 | Yes |
| American Subcontractors Assn | Special trade contractors | $1,000 | 3/20/07 | Christopher Van Hollen | D | MD-8 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $5,000 | 3/20/07 | Steny Hoyer | D | MD-5 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,500 | 3/20/07 | John Mica | R | FL-7 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Addison Wilson | R | SC-2 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Charles Rangel | D | NY-15 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Kathy Castor | D | FL-11 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Melissa Bean | D | IL-8 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 3/20/07 | Rick Larsen | D | WA-2 | Yes |
| Hedrick, Robert | Special trade contractors | $2,100 | 3/20/07 | Thelma Drake | R | VA-2 | Yes |
| Mcmannis, Sandra P | Environmental policy | $1,000 | 3/20/07 | Timothy Ryan | D | OH-17 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $2,000 | 3/20/07 | David Obey | D | WI-7 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $2,000 | 3/20/07 | Debbie Wasserman Schultz | D | FL-20 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $2,500 | 3/21/07 | Roy Blunt | R | MO-7 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Allyson Schwartz | D | PA-13 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Jim Matheson | D | UT-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | John Kuhl | R | NY-29 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Richard Baker | R | LA-6 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $388 | 3/21/07 | Thomas Davis | R | VA-11 | Yes |
| Baker, Carol | Special trade contractors | $1,000 | 3/21/07 | Jeb Hensarling | R | TX-5 | No |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $2,500 | 3/21/07 | Kendrick Meek | D | FL-17 | Yes |
| Michael Baker Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Gary Miller | R | CA-42 | Yes |
| Michael Baker Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Richard Baker | R | LA-6 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $2,000 | 3/21/07 | Shelley Capito | R | WV-2 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/21/07 | James Ramstad | R | MN-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Gary Miller | R | CA-42 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Ken Calvert | R | CA-44 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/21/07 | Mark Udall | D | CO-2 | Yes |
| Blackford, Loren | Environmental policy | $500 | 3/22/07 | Thomas Allen | D | ME-1 | Yes |
| Camp, Dresser & Mckee | Engineering, architecture & construction mgmt svcs | $500 | 3/22/07 | Grace Napolitano | D | CA-38 | Yes |
| Humber, Jeffrey L Jr | Engineering, architecture & construction mgmt svcs | $1,000 | 3/22/07 | William Clay | D | MO-1 | Yes |
| Munfakh, Abe | Engineering, architecture & construction mgmt svcs | $1,000 | 3/22/07 | Joseph Knollenberg | R | MI-9 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/22/07 | David Hobson | R | OH-7 | Yes |
| Arnold, Louise | Environmental policy | $250 | 3/23/07 | Bob Filner | D | CA-51 | Yes |
| Arnow, Robert | Environmental policy | $2,300 | 3/23/07 | Nita Lowey | D | NY-18 | Yes |
| Arnow, Robert | Environmental policy | $2,300 | 3/23/07 | Nita Lowey | D | NY-18 | Yes |
| Baker, Carol | Special trade contractors | $500 | 3/23/07 | Peter Sessions | R | TX-32 | No |
| Dumont, Chris | Special trade contractors | $2,300 | 3/23/07 | Paul Hodes | D | NH-2 | Yes |
| Dumont, Chris | Special trade contractors | $2,300 | 3/23/07 | Paul Hodes | D | NH-2 | Yes |
| Kovich, Ann E | Engineering, architecture & construction mgmt svcs | $250 | 3/23/07 | Kay Granger | R | TX-12 | Yes |
| Lord, Henry | Environmental policy | $500 | 3/23/07 | Joe Courtney | D | CT-2 | Yes |
| Mcclintock, Cynthia | Environmental policy | $750 | 3/23/07 | James McGovern | D | MA-3 | Yes |
| Tishman, John L | Engineering, architecture & construction mgmt svcs | $2,300 | 3/23/07 | Nita Lowey | D | NY-18 | Yes |
| Tishman, John L | Engineering, architecture & construction mgmt svcs | $2,300 | 3/23/07 | Nita Lowey | D | NY-18 | Yes |
| Hines, Tyrone | Special trade contractors | $500 | 3/24/07 | Melissa Bean | D | IL-8 | Yes |
| Kauffman, Kim a Mr | Engineering, architecture & construction mgmt svcs | $1,000 | 3/24/07 | Bob Inglis | R | SC-4 | No |
| Morrill, Bill F | Environmental policy | $2,300 | 3/24/07 | Christopher Murphy | D | CT-5 | Yes |
| Hanley, John T Jr | Water Utilities | $250 | 3/25/07 | Brian Higgins | D | NY-27 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Connie Mack | R | FL-14 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Dave Reichert | R | WA-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Heath Shuler | D | NC-11 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Kenny Hulshof | R | MO-9 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Robert Berry | D | AR-1 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/26/07 | Shelley Berkley | D | NV-1 | Yes |
| Corradino, Joseph | Engineering, architecture & construction mgmt svcs | $500 | 3/26/07 | Debbie Wasserman Schultz | D | FL-20 | Yes |
| Matchett, Andrew | Environmental policy | $1,000 | 3/26/07 | Ronald Kind | D | WI-3 | Yes |
| Matsumoto, Michael P | Engineering, architecture & construction mgmt svcs | $2,000 | 3/26/07 | Mazie Hirono | D | HI-2 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $500 | 3/26/07 | Norman Dicks | D | WA-6 | Yes |
| Sierra Club | Environmental policy | $3,000 | 3/26/07 | Nancy Pelosi | D | CA-8 | Not Voting |
| Waggoner, Joe a | Engineering, architecture & construction mgmt svcs | $500 | 3/26/07 | Charles Pickering | R | MS-3 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $5,000 | 3/27/07 | Steny Hoyer | D | MD-5 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/27/07 | Addison Wilson | R | SC-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/27/07 | Harry Mitchell | D | AZ-5 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/27/07 | Jo Ann Emerson | R | MO-8 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/27/07 | Ken Calvert | R | CA-44 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/27/07 | Rick Larsen | D | WA-2 | Yes |
| Atwater, Richard W Jr | Water Utilities | $500 | 3/27/07 | Grace Napolitano | D | CA-38 | Yes |
| Berlin, Kenneth | Environmental policy | $1,000 | 3/27/07 | Christopher Van Hollen | D | MD-8 | Yes |
| Carter & Burgess | Engineering, architecture & construction mgmt svcs | $250 | 3/27/07 | Thomas Davis | R | VA-11 | Yes |
| Dewberry, Sidney O Mr | Engineering, architecture & construction mgmt svcs | $2,300 | 3/27/07 | Thomas Davis | R | VA-11 | Yes |
| Dreher, David Mr | Environmental policy | $250 | 3/27/07 | Nick Rahall | D | WV-3 | Yes |
| Frenz - Argust, Marcia L Ms | Environmental policy | $300 | 3/27/07 | Nick Rahall | D | WV-3 | Yes |
| Haas, Chara C | Environmental policy | $2,300 | 3/27/07 | Joe Sestak | D | PA-7 | Yes |
| Kiernan, T C Mr | Environmental policy | $500 | 3/27/07 | Nick Rahall | D | WV-3 | Yes |
| La Mantia, Russ | Special trade contractors | $300 | 3/27/07 | William Pascrell | D | NJ-8 | Yes |
| Mcgivern, John | Special trade contractors | $250 | 3/27/07 | Todd Tiahrt | R | KS-4 | Yes |
| Meadows, William H Mr | Environmental policy | $1,000 | 3/27/07 | Nick Rahall | D | WV-3 | Yes |
| Mechanical Contractors Assn of America | Special trade contractors | $1,000 | 3/27/07 | Robert Andrews | D | NJ-1 | Yes |
| Mechanical Contractors Assn of America | Special trade contractors | $1,000 | 3/27/07 | Robert Andrews | D | NJ-1 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $2,500 | 3/27/07 | George Radanovich | R | CA-19 | Yes |
| Obey, Craig D Mr | Environmental policy | $500 | 3/27/07 | Nick Rahall | D | WV-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $-1,000 | 3/27/07 | Baron Hill | D | IN-9 | Yes |
| Ralph, Margaret W | Environmental policy | $1,000 | 3/27/07 | Joe Sestak | D | PA-7 | Yes |
| Requa, David a | Water Utilities | $500 | 3/27/07 | Grace Napolitano | D | CA-38 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Charles Dent | R | PA-15 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Eddie Johnson | D | TX-30 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Michael Michaud | D | ME-2 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Nydia Velázquez | D | NY-12 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Thomas Reynolds | R | NY-26 | Yes |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Todd Tiahrt | R | KS-4 | Yes |
| American Subcontractors Assn | Special trade contractors | $1,000 | 3/28/07 | Walter Herger | R | CA-2 | No |
| Camp, Dresser & Mckee | Engineering, architecture & construction mgmt svcs | $2,000 | 3/28/07 | Ciro Rodriguez | D | TX-23 | Yes |
| Day & Zimmerman | Engineering, architecture & construction mgmt svcs | $2,500 | 3/28/07 | Jerry Lewis | R | CA-41 | Yes |
| Durkee, Bruce | Environmental policy | $500 | 3/28/07 | Dennis Moore | D | KS-3 | Yes |
| Kahn, Wolf | Environmental policy | $250 | 3/28/07 | Paul Hodes | D | NH-2 | Yes |
| Klausner, Robert | Environmental policy | $500 | 3/28/07 | Jerry McNerney | D | CA-11 | Yes |
| Mann, Marion L | Environmental policy | $2,300 | 3/28/07 | Joe Sestak | D | PA-7 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/28/07 | Charles Dent | R | PA-15 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/28/07 | Nydia Velázquez | D | NY-12 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/28/07 | Walter Herger | R | CA-2 | No |
| National Rural Water Assn | Water Utilities | $1,000 | 3/28/07 | Todd Tiahrt | R | KS-4 | Yes |
| National Rural Water Assn | Water Utilities | $1,000 | 3/28/07 | Tom Cole | R | OK-4 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Lucille Roybal-Allard | D | CA-34 | Yes |
| Parsons Brinckerhoff | Engineering, architecture & construction mgmt svcs | $250 | 3/28/07 | James Oberstar | D | MN-8 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $2,000 | 3/28/07 | Baron Hill | D | IN-9 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Brian Baird | D | WA-3 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Joseph Knollenberg | R | MI-9 | Yes |
| Parsons Corp | Engineering, architecture & construction mgmt svcs | $1,000 | 3/28/07 | Shelley Berkley | D | NV-1 | Yes |
| Shankar, Cheri | Environmental policy | $500 | 3/28/07 | George Miller | D | CA-7 | Yes |
| Anderson, Nancy C | Environmental policy | $1,000 | 3/29/07 | Thomas Allen | D | ME-1 | Yes |
| Eaton, Michael R | Environmental policy | $500 | 3/29/07 | Jerry McNerney | D | CA-11 | Yes |
| Ferry, Sandra | Environmental policy | $1,000 | 3/29/07 | Thomas Allen | D | ME-1 | Yes |
| Hagge, Patricia H | Engineering, architecture & construction mgmt svcs | $2,300 | 3/29/07 | Thomas Allen | D | ME-1 | Yes |
| Hanson Professional Services | Engineering, architecture & construction mgmt svcs | $250 | 3/29/07 | Thomas Davis | R | VA-11 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 3/29/07 | Thomas Davis | R | VA-11 | Yes |
| League of Conservation Voters | Environmental policy | $500 | 3/29/07 | Jerry McNerney | D | CA-11 | Yes |
| Maser, Richard M | Engineering, architecture & construction mgmt svcs | $250 | 3/29/07 | Frank Pallone | D | NJ-6 | Yes |
| National Roofing Contractors Assn | Special trade contractors | $1,000 | 3/29/07 | Jon Porter | R | NV-3 | Yes |
| Nitze, Heidi | Environmental policy | $1,000 | 3/29/07 | Rush Holt | D | NJ-12 | Yes |
| Ross, Carl | Environmental policy | $350 | 3/29/07 | Anna Eshoo | D | CA-14 | Yes |
| Tolles, Martha G | Environmental policy | $-1,000 | 3/29/07 | Adam Schiff | D | CA-29 | Yes |
| California League of Conservation Voters | Environmental policy | $1,000 | 3/30/07 | Jerry McNerney | D | CA-11 | Yes |
| Carroll, Candace M | Environmental policy | $2,300 | 3/30/07 | Bob Filner | D | CA-51 | Yes |
| Carter, Jonathan | Engineering, architecture & construction mgmt svcs | $250 | 3/30/07 | Michael Simpson | R | ID-2 | Yes |
| Cotton, Elizabeth | Engineering, architecture & construction mgmt svcs | $500 | 3/30/07 | Emanuel Cleaver | D | MO-5 | Yes |
| Iotti, Robert | Engineering, architecture & construction mgmt svcs | $250 | 3/30/07 | Michael Simpson | R | ID-2 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $5,000 | 3/30/07 | Joseph Knollenberg | R | MI-9 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $4,000 | 3/30/07 | David Hobson | R | OH-7 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/30/07 | Barney Frank | D | MA-4 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/30/07 | David Weldon | R | FL-15 | No |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $1,000 | 3/30/07 | Jerry Lewis | R | CA-41 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $500 | 3/30/07 | William Clay | D | MO-1 | Yes |
| Jacobs Engineering Group | Engineering, architecture & construction mgmt svcs | $400 | 3/30/07 | Thaddeus McCotter | R | MI-11 | Yes |
| Powers, John | Environmental policy | $2,300 | 3/30/07 | Ed Perlmutter | D | CO-7 | Yes |
| Powers, John P | Environmental policy | $2,300 | 3/30/07 | Mark Udall | D | CO-2 | Yes |
| Rose, Jonathan | Environmental policy | $2,300 | 3/30/07 | Jerrold Nadler | D | NY-8 | Yes |
| Rose, Jonathan | Environmental policy | $2,300 | 3/30/07 | Jerrold Nadler | D | NY-8 | Yes |
| Rospos, Thomas | Engineering, architecture & construction mgmt svcs | $1,000 | 3/30/07 | Frank Pallone | D | NJ-6 | Yes |
| Thomas, Edward D | Environmental policy | $1,000 | 3/30/07 | Rush Holt | D | NJ-12 | Yes |
| Arnow, Joan | Environmental policy | $1,000 | 3/31/07 | John Hall | D | NY-19 | Yes |
| Arnow, Robert H | Environmental policy | $1,000 | 3/31/07 | John Hall | D | NY-19 | Yes |
| Blackwelder, Brent | Environmental policy | $250 | 3/31/07 | Jerry McNerney | D | CA-11 | Yes |
| Boyd, Ww | Engineering, architecture & construction mgmt svcs | $500 | 3/31/07 | Lynn Westmoreland | R | GA-3 | No |
| Boyd, Ww | Engineering, architecture & construction mgmt svcs | $300 | 3/31/07 | Marilyn Musgrave | R | CO-4 | No |
| Champlin, Calvin | Engineering, architecture & construction mgmt svcs | $2,000 | 3/31/07 | Dean Heller | R | NV-2 | Yes |
| Champlin, Calvin | Engineering, architecture & construction mgmt svcs | $2,000 | 3/31/07 | Jon Porter | R | NV-3 | Yes |
| Cheng, Chieh San | Engineering, architecture & construction mgmt svcs | $1,000 | 3/31/07 | Christopher Van Hollen | D | MD-8 | Yes |
| Chumbley, Avery B | Water Utilities | $500 | 3/31/07 | Mazie Hirono | D | HI-2 | Yes |
| Flannery, Michael Mr | Engineering, architecture & construction mgmt svcs | $1,000 | 3/31/07 | Geoff Davis | R | KY-4 | Yes |
| Giannelli, Deborah | Special trade contractors | $1,000 | 3/31/07 | Steven Pearce | R | NM-2 | Yes |
| Giannelli, James | Special trade contractors | $1,000 | 3/31/07 | Steven Pearce | R | NM-2 | Yes |
| Jackson, Cary | Special trade contractors | $2,300 | 3/31/07 | David Wu | D | OR-1 | Yes |
| Joerger, Albert G | Environmental policy | $2,300 | 3/31/07 | Vern Buchanan | R | FL-13 | Yes |
| Joerger, Albert G | Environmental policy | $2,300 | 3/31/07 | Vern Buchanan | R | FL-13 | Yes |
| Joerger, Pauline W | Environmental policy | $2,300 | 3/31/07 | Vern Buchanan | R | FL-13 | Yes |
| Joerger, Pauline W | Environmental policy | $2,300 | 3/31/07 | Vern Buchanan | R | FL-13 | Yes |
| Longest, James B | Engineering, architecture & construction mgmt svcs | $2,300 | 3/31/07 | Baron Hill | D | IN-9 | Yes |
| Mulhern, Michael H | Engineering, architecture & construction mgmt svcs | $500 | 3/31/07 | Stephen Lynch | D | MA-9 | Yes |
| Perkins, Thomas | Environmental policy | $2,100 | 3/31/07 | Jerry McNerney | D | CA-11 | Yes |
| Rasin, Rudolph S | Environmental policy | $1,000 | 3/31/07 | David Loebsack | D | IA-2 | Yes |
| Scarbrough, Brent | Special trade contractors | $2,300 | 3/31/07 | Lynn Westmoreland | R | GA-3 | No |
| Schlickeisen, Rodger | Environmental policy | $250 | 3/31/07 | Jerry McNerney | D | CA-11 | Yes |
| Larson Design Group | Engineering, architecture & construction mgmt svcs | $100 | 4/1/07 | John Peterson | R | PA-5 | Yes |
| Mills, Donald | Water Utilities | $250 | 4/1/07 | Jim Costa | D | CA-20 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 4/2/07 | Peter Visclosky | D | IN-1 | Yes |
| Lord, Henry | Environmental policy | $500 | 4/2/07 | Rosa DeLauro | D | CT-3 | Not Voting |
| Martin, Thomas B Mr | Environmental policy | $500 | 4/2/07 | Nick Rahall | D | WV-3 | Yes |
| Halff Assoc | Engineering, architecture & construction mgmt svcs | $500 | 4/3/07 | Peter Visclosky | D | IN-1 | Yes |
| Imwalle, Shane | Engineering, architecture & construction mgmt svcs | $1,000 | 4/3/07 | Michael Turner | R | OH-3 | Yes |
| Ltk Consulting Services | Engineering, architecture & construction mgmt svcs | $1,000 | 4/3/07 | James Oberstar | D | MN-8 | Yes |
| Pecoraro, Onofrio | Special trade contractors | $1,000 | 4/3/07 | Darrell Issa | R | CA-49 | No |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,500 | 4/4/07 | Jesse Jackson | D | IL-2 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 4/4/07 | James Oberstar | D | MN-8 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 4/4/07 | Peter Visclosky | D | IN-1 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $-1,000 | 4/4/07 | Peter Visclosky | D | IN-1 | Yes |
| Shields, Donald C Mr | Water Utilities | $250 | 4/4/07 | Bob Inglis | R | SC-4 | No |
| American Council of Engineering Cos | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Daniel Lipinski | D | IL-3 | Yes |
| Ch2m Hill | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Xavier Becerra | D | CA-31 | Yes |
| Hanson Professional Services | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Donald Manzullo | R | IL-16 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | David Obey | D | WI-7 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Eddie Johnson | D | TX-30 | Yes |
| Hdr Inc | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Joseph Knollenberg | R | MI-9 | Yes |
| National Assn of Home Builders | Engineering, architecture & construction mgmt svcs | $2,000 | 4/5/07 | Robin Hayes | R | NC-8 | Yes |
| National Assn of Home Builders | Engineering, architecture & construction mgmt svcs | $1,000 | 4/5/07 | Heath Shuler | D | NC-11 | Yes |
| Black & Veatch | Engineering, architecture & construction mgmt svcs | $500 | 4/6/07 | Peter Visclosky | D | IN-1 | Yes |
| Sheerr-Gross, Deirdre | Environmental policy | $1,000 | 4/6/07 | Paul Hodes | D | NH-2 | Yes |
Contributions data source: OpenSecrets.org
